Projects & Case Studies
Demonstrating results across Libya's major oilfields and facilities.
Pipeline Leak Detection - Wafa Field
Client: NOC Subsidiary 2026Challenge
The Wafa field's 40-year-old pipeline network showed signs of degradation requiring proactive monitoring.
Solution
Deployed Distran ultrasonic imaging cameras at 15 critical junction points.
Results
30%Reduction in unplanned shutdowns
3 leaksDetected before production impact
$1.2MEstimated cost avoidance
Drilling Optimization - Sarir Field
Client: AGOCO 2026Challenge
Horizontal well re-entry required precision drilling with high stuck-pipe risk.
Solution
Implemented Exebenus AI optimization platform for real-time parameter adjustment.
Results
12 daysFaster than offset wells
$450KCost savings
ZeroStuck-pipe incidents