Projects & Case Studies

Demonstrating results across Libya's major oilfields and facilities.

Pipeline Leak Detection - Wafa Field

Client: NOC Subsidiary 2026

Challenge

The Wafa field's 40-year-old pipeline network showed signs of degradation requiring proactive monitoring.

Solution

Deployed Distran ultrasonic imaging cameras at 15 critical junction points.

Results

30%Reduction in unplanned shutdowns
3 leaksDetected before production impact
$1.2MEstimated cost avoidance
Related Service →

Drilling Optimization - Sarir Field

Client: AGOCO 2026

Challenge

Horizontal well re-entry required precision drilling with high stuck-pipe risk.

Solution

Implemented Exebenus AI optimization platform for real-time parameter adjustment.

Results

12 daysFaster than offset wells
$450KCost savings
ZeroStuck-pipe incidents
Related Service →